Planning & Zoning

 AGENDA

MONDAY, JULY 20, 2015 AT 7:00 PM

BANANA FACTORY, RISBON ROOM
25 W. THIRD STREET, BETHLEHEM, PA

All members please call Philip Roeder at 610-865-8396 if you will not attend


  1. 310 Taylor Street (Bonn Place Brewing Co)
  2. It is proposed to install sunbrella awnings printed with company signage
    above overhead and main doors.  It is also proposed to replace existing
    windows with aluminum frames and clear glass.  Included in the proposal is
    sidewalk repair and the installation of an ADA compliant entrance ramp.
    OWNER/APPLICANT:  Stephen Elek/Samuele Masotto

  3. 626 Evans Street
  4. Roof work was completed as an emergency repair.  Architectural shingles replaced 3-tab asphalt shingles on the damaged section of roof.
    OWNER/APPLICANT:  Jamie DeJesus/Heidi Westerman

  5. 413 Vine Street
  6. It is proposed to demolish the cinder block remains of an unused chimney and
    replace the roof area.
    OWNER/APPLICANT:  Al Finnegan/Tim Finnegan

All applicants or their representative MUST appear at the hearing for their case to be heard.